Dickie & Moore Construction were employed by Lidl GB to carry out fit-out works at Units 2&3 Wallace Well Retail Park, Robroyston, Glasgow, G33 1AD in line with the requirements of the 2018.3 specifications.

 

Works commenced on 24th August and PC was achieved 3rd December line with the agreed programme.

The unit was formerly a B&M Store.

D&M works involved the installation of new underground drainage, installed to provide drainage pop-ups for Lidl’s bakery and warehouse (no sales floor drainage). Partitioning works involved construction of non-fire rated and fire-rated partition walls, up to 9.5m in height to separate the sales floor and warehouse. Existing walls were lined up to 4.2m in some areas and new partitions formed the back of house rooms.

A full new M&E installation followed in line with the specification, including new refrigeration by Carrier / AHT and CCTV, fire alarm and intruder.

A new adhesive tiled floor was installed throughout using the specification 300×300 Flakes tiles. OWA suspended ceilings were installed to the sales floor at 4m and back of house rooms at specification heights. Specification door sets were installed with new Geze auto doors installed at the new entrance.

Externally, a new canopy was installed above the new trolley bay, with the existing store block frontage removed and pillars formed to house new shopfront glazing. The existing Kingspan wall panels were sprayed, with new fire exit doors and windows formed front and rear.

 

MORE THAN CONSTRUCTION
Latest news
  • New PureGym in Giffnock
    September 19, 2023
    New PureGym in Giffnock
    Full demolition / strip out, external fabric improvements and internal fit out to PureGym specification...
  • Trade Dress for IKEA Glasgow
    September 19, 2023
    Trade Dress for IKEA Glasgow
    Trade Dress program for IKEA Glasgow...
  • New Build Food Convenience Store
    July 26, 2022
    New Build Food Convenience Store
    New Build Food Convenience store coming soon.......
  • Focusing on Sustainbility
    March 14, 2022
    Focusing on Sustainbility
    It's fantastic to see that sustainability is being made a priority in our infrastructure.
  • TSB Contract
    March 2, 2022
    TSB Contract
    Dickie & Moore have been appointed to carry out lighting replacement to a rollout of 66 TSB banks across Scotland & the North East Of England.
  • Muir of Ord Turnkey Retail Project
    November 18, 2021
    Muir of Ord Turnkey Retail Project
    We are proud to announce we have secured planning permission for a turnkey construction project in the highland town of Muir of Ord.