  • Completion of Lidl, Robroyston

Dickie & Moore Construction were employed by Lidl GB to carry out fit-out works at Units 2&3 Wallace Well Retail Park, Robroyston, Glasgow, G33 1AD in line with the requirements of the 2018.3 specifications.

 

Works commenced on 24th August and PC was achieved 3rd December line with the agreed programme.

The unit was formerly a B&M Store.

D&M works involved the installation of new underground drainage, installed to provide drainage pop-ups for Lidl’s bakery and warehouse (no sales floor drainage). Partitioning works involved construction of non-fire rated and fire-rated partition walls, up to 9.5m in height to separate the sales floor and warehouse. Existing walls were lined up to 4.2m in some areas and new partitions formed the back of house rooms.

A full new M&E installation followed in line with the specification, including new refrigeration by Carrier / AHT and CCTV, fire alarm and intruder.

A new adhesive tiled floor was installed throughout using the specification 300×300 Flakes tiles. OWA suspended ceilings were installed to the sales floor at 4m and back of house rooms at specification heights. Specification door sets were installed with new Geze auto doors installed at the new entrance.

Externally, a new canopy was installed above the new trolley bay, with the existing store block frontage removed and pillars formed to house new shopfront glazing. The existing Kingspan wall panels were sprayed, with new fire exit doors and windows formed front and rear.

 

MORE THAN CONSTRUCTION
Latest news
  • Living Wage Employer Accreditation
    December 10, 2025
    Living Wage Employer Accreditation
    Dickie & Moore are proud to continue our support of the Lighthouse Charity.
  • Broadwood Farm Restaurant Refurb
    May 27, 2025
    Broadwood Farm Restaurant Refurb
    The popular restaurant was updated with new internal and external decoration, tiling, carpet, M&E upgrades, and signage - creating a warm and inviting interior. Works also included external painting, landscaping, and new feature festoon lighting.
  • Two new projects for Premier Inn
    May 13, 2025
    Two new projects for Premier Inn
    Dickie and Moore are very excited to commence two new projects for Premier Inn, in Newton Mearns and Stepps.
  • ISS Training Academy
    April 30, 2025
    ISS Training Academy
    The new training facility will be an invaluable resource to trainees, allowing them to learn in a simulated built environment. It was designed to resemble a typical ward bedroom, to prepare trainees for real-world scenarios.
  • Thank You from the Lighthouse Charity
    November 5, 2024
    Thank You from the Lighthouse Charity
    Dickie & Moore are proud to continue our support of the Lighthouse Charity.
  • Santander Office Refurbishment
    October 30, 2024
    Santander Office Refurbishment
    Dickie & Moore have been appointed by ISS to carry out the refurbishment of 5 floors at 301 St Vincent Street, Glasgow.